Track and overhead line works between Roches Noires station and the Nouaceur technical centre will require an investment of MAD 300 million (excluding VAT). These works...
The services notably include design and execution studies, preparatory works and site installations, the manufacture and installation of metal structures, as well as associated civil engineering...
Behind the rails of the Kenitra–Marrakech high‑speed line, an armada of European and Asian suppliers is shaping Morocco’s high‑speed rail. Track equipment, high‑technology switches, specialized machinery…...